NSCC provides a complete design and construct solutions for all foundation engineering works for commercial and industrial civil engineering structures.

Land based foundation engineering techniques used are:

 
  Piled Foundations:



 
   

Rotary bored piles under casing & bentonite

 
   

Driven precast piles

   

Driven cast-in-situ piles
   

Continuous flight auger (CFA) piles
 
Earth Retaining Structures:

   

Contiguous piled walls

   

Secant piled walls
   


Post & plank walls

 
   
Diaphragm walls

 
   

Ground anchors

    Deep dewatering wells
           
 
   


CONCORD TOWERS- JUMEIRAH LAKE TOWERS

DUBAI, UAE


 
 

Client
32 Group

Consultant

Arif & Bintoak, Hyder Consulting

Main Contractor

NSCC

Type of Work

Installation of Site Offices, Project Sign Boards, Shoring, Excavation, Dewatering & Piling Works

Start Date
22/03/2005

Completion Date
02/09/2005

Project Details

Main Piles

Diameter: 900, 1000 & 1200 mm

No. of Piles: 271 nos.

Depth: Up to 27.5 m

Shoring

Perimeter: 232 lm

Max. Retained Height: 8.5 m

Diameter: 750 mm

No. of Contiguous Piles: 247 nos.

No. of Secant Piles: 51 nos.


 
 
 

SKY GARDENS AT DIFC
DUBAI, UAE

 
 


Client
Mazaya Group Real Estate Co.

Consultant

Atkins

Project Manager
Project Management & Controls Co.
(PROJACS)

Main Contractor
NSCC

Type of Work

Piling, Shoring, Dewatering & Excavation Works

Start Date
15/03/2005


Completion Date
15/08/2005

Project Details

Main Piles

Diameter: 750, 1000 & 1200 mm

No. of Piles: 347 nos.

Depth: Up to 35.7 m

Shoring

Perimeter: 310.77 lm

Retained Height: Up to 11.7 m

Diameter: 800 & 900 mm

No. of Contiguous Piles: 159 nos.

No. of I-Beams: 81 nos.

 
 



 
 

DOWNTOWN JEBEL ALI PARCELS 1-4

DUBAI, UAE

 
 


Client

Limitless LLC / Ports, Customs & Free Zone Corp.

Consultant
Burt Hill

Main Contractor
NSCC-SBF JV

Type of Work
Piling, Shoring, Dewatering & Excavation Works

Start Date
22/10/2005

Completion Date
18/01/2006


Project Details


Main Piles

Diameter: 1000 mm

No. of Piles: 1064 nos.

Shoring

Perimeter: 600 lm

Retained Height: 6.6 m

Diameter: 700 & 750 mm

No. of Contiguous Piles: 807 nos.

No. of Ground Anchors: 174 nos.

Capacity: 45 ton each

 
 



 

TIFFANY TOWERS TOWER AT PLOT W2, JUMEIRAH LAKES
DUBAI, UAE

 
 

Client

Mazyood Giga International

Consultant
Atkins

Main Contractor
NSCC


Type of Work

Enabling Works


Start Date
03/01/2006

Completion Date
17/04/2006


Project Details


Main Piles

Diameter: 900 & 1200 mm

No. of Piles: 112 nos.

Depth: Up to 45.0 m

Shoring

Perimeter: 230 lm

Retained Height: 15.25 m


Diameter: 0.8 m

No. of Contiguous Piles: 272 nos.

 
 
 

PARK PLACE RESIDENTIAL & COMMERCIAL DEVELOPMENT

DUBAI, UAE


 
 


Client
H.E. Humaid Bin Drai

Consultant

The Cox Group Pty Ltd., Dubai

Project Managers
Clifton Coney Stevens

Type of Work
Shoring, Piling & Foward Works

Start Date
30/03/2004

Completion Date
17/10/2004


Project Details

Main Piles

Diameter: 1500 mm

No. of Piles: 95 nos.

Depth: 42.5 m

Shoring (using I-Beams)

Perimeter: 156.04 lm

Retained Height: 6.15 m

No. of I-Beams: 167 nos.

 
 



 

RESIDENTIAL BUILDING FOR H.H SH. FATIMA
ABU DHABI, UAE


 
 

Client
H.H. Sheikha Fatima Bint Mubarak

Consultant

Crang & Boak

Main Contractor
Al Ain General Contracting Company (ALGECO)

Type of Work
Anchored Secant Piles


Start Date
12/03/2002

Completion Date
06/06/2002


Project Details

Shoring

Perimeter: 165 lm

Retained Height: 9.0 m

Diameter: 750 & 900 mm

No. of Secant Piles: 248 nos.

No. of Ground Anchors: 38 nos.

 
 


 
MARINA MALL, ABU DHABI INTERNATIONAL MARINE SPORTS CLUB
ABU DHABI, UAE


 
 

Client
Abu Dhabi International Marine Sports Club

Consultant
GIBB Middle East

Main Contractor
Al Habtoor Murray & Roberts JV

Type of Work
Design, Preparation of Shop Drawings & Piling Works


Start Date

13/05/1999

Completion Date
26/07/1999


Project Details

Main Piles

Diameter: 600, 750, 800, 900 & 1000 mm

No. of Piles: 1420 nos.

Depth: 15 m

 
 

 
 

AL HAMID GROUP, TWO COMMERCIAL BUILDINGS
ABU DHABI, UAE

 
 
Client
H.H. SH. Mohamed Bin Butti Al Hamid Private Office

Consultant
Al Suweidi Engineering Consultants Bureau

Project Manager
Cansult Ltd.

Main Contractor
NSCC

Type of Work
Shoring, Excavation, Dewatering and Tension Pile Works

Start Date
01/03/2005

Completion Date
15/07/2005


Project Details

Shoring

Perimeter: 304 lm

Retained Height: 10.5 m

Excavation: 46,000 m3

No. of Secant Piles: 502 nos.

Diameter: 750 mm

No. of Ground Anchors: 92 Nos.

No. of Tension Piles: 24 nos.

Diameter: 600 mm

Depth: 6.0 m

 
 
 


ABU DHABI RETIREMENT PENSIONS & BENEFIT FUND

ABU DHABI, UAE

 
 
Client
Abu Dhabi Retirement Pensions & Benefit Fund

Consultant
Architecture & Planning Group

Project Manager
Hill International

Main Contractor
NSCC

Type of Work
Excavation, Shoring & Piling Works

Start Date
17/09/2005

Completion Date
10/01/2006


Project Details

Main Piles

Diameter: 600 & 750 mm

No. of Piles: 546 nos.

Depth: Up to 7.5 m

Shoring (using I-Beams)

Retained Height: 6.0 m

Excavation: 26,000 m3

No. of I-Beams: 260 nos.

 

 

FORTE GRAND HOTEL REDEVELOPMENT
ABU DHABI, UAE

 
 

Client
H. H. Mubarak Bin Mohammed Al Nahyan

Consultant
Keo International

Main Contractor
Dhabi Contracting Co. LLC

Type of Work
Secant Pile, Guniting and Ground Anchor Works

Project Details

Perimeter: 450 lm

Retained Height: 10.8 m

Diameter: 750 & 900 mm

No. of Secant Piles: 685 nos.

No. of Ground Anchors: 70 nos.

Start Date: 25/02/2001

Completion Date: 20/06/2001

 

 
 

BARKA WATER TRANSMISSION PROJECT
BARKA, OMAN

 
 




Client
Ministry of Housing, Electricity & Water

Consultant
Al Abraj-NJS Consultants

Main Contractor
Erko-Bojest JV

Type of Work
Foundation Piles for two nos. 160 m & 100 m main Water Reservoirs using CFA method.

Start Date
06/12/2001

Completion Date
21/05/2002

Project Details

Main Piles

Diameter: 600 & 700 mm

No. of Piles: 3422 nos.

Depth: Up to 9.7 m

 
 

SAVOLA SUGAR REFINERY PROJECT
JEDDAH ISLAMIC PORT, SAUDI ARABIA


 
 
Consultant/Client
Simon Carves


Main Contractor

TPL Arabia Ltd

Type of Work

Continuous Flight Auger (CFA) Piles

Project Details


No. of Piles:
1200 nos.

Dia: 600 mm

Depth: 32 m

Start Date: June 1995

Completion Date: January 1996


 

 