NSCC was the first company to bring in the HDD technology into the region. This state-of-the-art technique offers clients in the region a non-destructive technique of underground cable positioning. NSCC’s cables and ducts have been used by various local authorities for the connection of electric cables, fibre-optic lines, water and other utilities. HDD services also extend to the oil and gas industries, with the execution of shore approaches to oil platforms in remote offshore locations.

Backed by a large pool of regional resources, NSCC is able to serve a multitude of client requirements concurrently. Utilising our mega-rigs, NSCC is able to carry out crossings 1300 metres in length while pulling product line pipe 1500 millimetres in diameter. With our teams of qualified supervisors and site operatives having at least fifteen years of worldwide experience in horizontal drilling, clients can expect their projects to run smoothly, professionally and cost effectively.

The smaller and medium-sized HDD rigs are able to carry out period contracts comprising of a large number of short road crossings.

NSCC has one of the largest fleets of HDD rigs in the region, ranging from 12 tonnes to 250 tonnes in capacity, as well as drilling tools and accessories for the different types of soil and rock strata.

After almost a decade of service to the civil engineering and the oil and gas industries, NSCC continues to serve a broad client base all over the region.

 
 

THE FUNDAMENTAL WORKING STEPS OF THE HORIZONTAL
DIRECTIONAL DRILLING PROCESS


 
 
Pilot Hole: The initial hole drilled to the exacting standards of both horizontal and vertical control.

Ground conditions will dictate the drilling procedure used with jetting for softer formations or a mud motor and drill bit for harder rock type formations. In both cases the pumping of a drilling fluid is required to suspend and carry material cut back to the surface. The advanced survey control systems combined with highly developed tools enable downhole drilling to progress along an accurately controlled path.

With control of the drill path being continuously calculated and updated as the drill head is advanced, accuracy in reaching the target position is assured.


 
 
 
 


Reaming
: The controlled procedure of increasing the hole size to the required diameter.

For the reaming (hole opening) processes, equipment will be chosen with careful consideration for the ground conditions expected. A complete range of equipment is available for the hardest formations that could be encountered. The pumping of drilling fluid remains a key component in ensuring material as it is cut, is transported to the surface as reaming progresses.


 
 
 
 

Pipe installation
: Installation of the product pipe into the hole in one continuous pulling operation

Completion of the pilot hole and reaming procedure will enable the pipeline installation to take place.

Connection of the drill pipe to the pulling assembly ahead of the product line enables the pre welded pipeline to be pulled into the reamed hole. A continuous operation is completed when the pipelines leading end emerges at the drill rig position.

 
 
 
 

 
 

WATER SUPPLY AND STORAGE FACILITY FOR LULU ISLAND
ABU DHABI, UAE


 
 
Client
ADWEA

Consultant
Pencol International

Main Contractor
General Construction Company
WLL

Start Date
09/04/1997

Completion Date
31/07/1999

Project Details

The first such project in the Middle East was to link Abu Dhabi Island (Free Port Area to Lulu Island) with twin 32” diameter steel pipelines.


Rig Type:
400 Ton Drill Rig

Length of Crossing:
900 m (each)

No. of Crossings:
2 nos.

Drilling Depth:
20 m (under the sea bed)
 
 
 

WATER SUPPLY PIPELINE -
SAMALIAH ISLAND CROSSINGS
ABU DHABI, UAE

 
 

Client
ADWEA

Contractor
Tebodin Middle East Ltd.

Main Contractor
Al Nasr Irrigation & Contracting Co.

Start Date
12/12/1999

Completion Date
12/04/2000


Project Details

Supply, Welding, Coating, Testing and Installation of 24” pipeline from Abu Dhabi Main Land to Samaliah Island.

Rig Type: 400 Ton Drill Rig

Length of Crossing: 1374 m

No. of Crossings: 1 no.

Drilling Depth: 10 m (under the sea bed)

 
 

 

MUSNOAH ISLAND CROSSING - WATER SUPPLY PIPELINE
ABU DHABI, UAE

 
 

Client
ADWEA

Contractor
Ahmed Abdul Wareth

Main Contractor
Al Nasr Irrigation & Contracting Co.

Project Location
Abu Dhabi, UAE

Start Date
04/12/1999

Completion Date
02/03/2000

Project Details

Supply, Welding, Coating, Testing and Installation of 24” pipeline from Abu Dhabi Main Land to Musnoah Island.

Rig Type: 400 Ton Drill Rig

Product: 24” diameter steel pipe

Length of Crossings: 1200 m

No. of Crossings: 1 no.

Drilling Depth: 15 m (under the sea bed)

 
 
 

 
 

UMM AL NAR 'B' WATERSCHEME - CHANNEL CROSSINGS

ABU DHABI
, UAE


 
 

Client
ADWEA

Contractor
Tebodin Middle East Ltd.

Main Contractor
Al Nasr Irrigation & Contracting Co.

Start Date
26/03/2001

Completion Date
22/08/2001

Project Details

Supply, Welding, Testing, Coating and Installation of 42” water pipeline and 12" steel sleeve underneath UAN channel.

Rig Type: 250 Ton Drill Rig

Products: 42” water pipeline & 12” steel pipe containing a 160 mm HDPE pipe

Length of Crossings: 687 m & 666 m

No. of Crossings: 2 nos.

Drilling Depth: 10 m (under the sea bed)

 


 
SURFACE WATER DRAINAGE AT RAHA BEACH
ABU DHABI, UAE


 
 

Client
Abu Dhabi Sewerage Project Committee

Consultant
Dorsch Consult

Main Contractor
Mabani Co. WLL

Start Date
15/02/2005

Completion Date
30/04/2005


Project Details

Installation of 7x315 mm HDPE PE100 SDR11 pipelines at Al Raha Beach, Abu Dhabi.

Rig Type: 12 Ton Drill Rig

Length of Crossing: 100-150 m each

No. of Crossings: 7 nos.

Drilling Depth: Shore Approach

 
 

 
 

DAS ISLAND FLARE SYSTEM

DAS ISLAND, UAE

 
 

Client
ADMA-OPCO

Consultant
Mott MacDonald

Main Contractor

NPCC

Start Date
13/09/2001

Completion Date
20/09/2001

Project Details

Installation of 2x200 mm HDPE SDR11 PE100 pipelines.

Rig Type: 250 Ton Drill Rig

Length of Crossing: 350 m

No. of Crossings: 2 nos.

Drilling Depth: Shore Approach

 
 

SHARJAH GAS DISTRIBUTION NETWORK
SHARJAH, UAE

 
 

Client
Sharjah Electricity and Water Authority

Consultant
PLE International

Main Contractor

SS Lootah/ BC Gas International JV


Start Date
21/06/2000

Completion Date
30/11/2002

Project Details


Contract includes the second and third phases of the Sharjah Gas Distribution Network, where NSCC completed in excess of 80 kilometres of drilling.

Rig Type: 12 Ton Drill Rig

Length of Crossing: 20 m - 150 m

No. of Crossings: 1014 nos.

Pipe Diameter: 32mm-180mm

Depth of Pipeline: 1.5 m - 4 m (below sea bed)


 
 

CHANNEL CROSSINGS FROM AL SADR TO KHOR FARIDA
ABU DHABI, UAE

 
 

Client
Abu Dhabi Municipality

Main Contractor
Al Nasr Irrigation and Contracting Co.

Start Date
07/10/1997

Completion Date
21/12/1997

Project Details

Installation of 4 nos. of HDPE pipe underneath the channel

Rig Type: 12 Ton Drill Rig

Length of Crossings: Up to 240 m (each)

No of Crossings: 4 Nos.

Pipe Diameter: 2x315 and 2x160 HDPE pipe PE100 SDR11

 
 

CABLE CROSSING AT AL SEEF, SHARJAH CREEK
SHARJAH, UAE

 
 

Client
Sharjah Electricity and Water Authority

Consultant
Halcrow

Main Contractor
Scan Electromechanical

Project Details

132 kV Cable Crossing of Sharjah Creek at Al Seef.

Rig Type: 35 Ton Drill Rig

Length of Crossing: 261 m (each)

No. of Crossings: 2 nos.

Pipe Diameter: (3x180 mm + 1 x 63 mm) HDPE bundled pipes (each)

Depth of Pipeline: 10 m (below sea bed)

 
 

HDD/CHANNEL CROSSING - UMM AL NAR

ABU DHABI, UAE


 
 

Client
GASCO

Main Contractor
NPCC

Start Date
15/12/2002

Completion Date
25/01/2003


Project Details

Installation of 18” crude oil pipeline.

Rig Type: 250 Ton Drill Rig

Length of Crossing: 630 m

No. of Crossings: 1 no.

Crude Oil steel Pipe: 18”

Drilling Depth: 8 m (under the sea bed)

 
 
TD 120 GSEM/FCM COMPLEX
DUBAI, UAE

 
 

Client
Dubai International Airport

Consultant
Osman Audeh & Associates

Main Contractor
Associated Construction & Investment Co

Start Date
22/07/1999

Completion Date
24/08/1999


Project Details

TD-120 GSEM Complex & FCM Complex at Dubai International Airport.

Rig Type: 12 Ton Drill Rig

Length of Crossings: 96 m (each)

No. of Crossings: 12

Diameter of Pipes: 110 mm - 400 mm HDPE

Depth of Pipeline: 3.5 m (below road level)

 
 

GAS PIPELINE CROSSING OVER
GARGAR RIVER
NORTH AHWAZ
, IRAN

 
 

Client
National Iranian Gas Co.

Consultant
Energy Consulting Eng.

Main Contractor
SAT Company


Start Date
22/01/2005

Completion Date
08/02/2005

Project Details

Installation of 24” gas pipeline underneath Gargar river in the area of North Ahwaz, Iran.

Rig Type: 250 Ton Drill Rig

Length of Crossing: 500 m

No. of Crossings: 1no.

Drilling Depth: 10 m (under the river bed)

 
 
 
 
OIL PIPELINE RIVER CROSSING
DARQUAIN, IRAN


 
 

Client
National Iranian Oil Co.

Consultant
Snamprogetti Ltd.

Main Contractor
AGIP / ENI

Start Date
29/09/2003

Completion Date
04/11/2003

Project Details

Installation of 20” crude oil pipeline inserted inside 32” steel casing underneath Karoon river.

Rig Type: 250 Ton Drill Rig

Length of Crossing: 500 m

No. of Crossings: 1 no.

Drilling Depth: 8 m (under the river bed)

 

 