With vast experience of marine piling, NSCC is recognized as not only a market leader, but also an innovator in this highly specialized line of work.

Working hand in hand with the land-based foundation engineering team, and drawing on a common resource base, the marine team can call upon the very latest technologically advanced plant and equipment, including hi-torque rotary drilling rigs, vibro hammers, barges and allied machinery. In addition, we enjoy the expertise and experience of our project managers, engineers, superintendents, supervisory staff and operatives.

Offering technically sound marine engineering solutions, thanks to a large database of completed projects and an impressive tradition of success in the design of such works, NSCC has expertise across a broad spectrum of disciplines.

These include:

 
   

Harbours

 
   

Jetties

 
   

Marinas

 
   

Slipways

 
   

Rock revetment

 
   

Pontoons

 
   

Permanently cased rotary piles

 
   

Driven pipe piles

 
   

Sheet-piled walls

 
  The marine works division is also able to offer budgetary proposals to private developers and local authorities.  

   
 


MARITIME INDUSTRIAL SERVICES LTD. - QUAY EXTENSION
SHARJAH, UAE


 
 
Client
Maritime Industrial Services Ltd. (MIS)

Consulting Engineer
Halcrow International Partnership

Main Contractor
NSCC, Sharjah

Project Location
Mina Khaled, Sharjah

Start Date
31/03/2003

Completion Date
09/11/ 2003


Project Details

Dredging and reclamation of 620,000 m3 of sand/calcarenite up to -8.0m HSD and construction of a 500m long tied back sheet piled quay wall, demolition of a coast guard existing jetty, removal of existing rock revetment. Construction of the quay wall included the supply and fixing of associated quay furniture (bollards, fenders, mooring rings, hand grids stainless steel ladders & navigation buoys etc.)

This project involves the construction & commissioning of a quay wall & jetty inside Port Khalid, Sharjah for MIS, Sharjah along with Demolition of the existing coast guard jetty. The project site is within the jurisdiction of the Sharjah Port Authority and the entire works are carried out according to their requirement. NSCC has been awarded the project based on the alternate proposal submitted by us by doing value engineering, done by the in-house design department, on the conforming design.

The job was completed on time and within budget.

 
 

 

 

CONSTRUCTION OF NEW JETTY ON MUBARRAZ ISLAND
ABU DHABI, UAE


 
 

Client
Abu Dhabi Oil Co. Ltd. (Japan) - ADOC

Consulting Engineer
Tebodin Middle East

Main Contractor
Arabtec - NSCC JV

Project Location
Mubarraz Island, Abu Dhabi

Start Date
16/05/2002

Completion Date
11/10/2003 (Part I)
27/01/2004 (Part II)

Project Details

Tender No. ADOC/PM-01/TN-23, Construction of New Jetty and demolition of existing jetty at Mubarraz Island for. Construction of an offshore oilfield jetty founded on marine steel circular piles (140 ton capacity) consisting of a concrete abutment, approach trestle (100m long), jetty head and associated civil, mechanical & electrical works.

 
 
 
ABU DHABI SHIP BUILDING SITE EXPANSION
ABU DHABI, UAE

 
 

Client
Abu Dhabi Ship Building

Consultant
Halcrow International Partnership

Main Contractor

Arabtec - Overseas Ast JV


Type of Work

Bored Pile Temporary Casing and Marine Pile Works

Project Details

Diameter: 750 mm

No. of Marine Piles: 93 nos.

Depth: 20.0 m

No. of Land Piles: 117 nos.

Depth: 17.5m

Start Date: 15/06/2000

Completion Date: 30/09/2000

 
 


EXTENSION OF BOUNDARY WALL & REVETMENT WORKS
ABU DHABI, UAE


 
 

Client
The Private Department of H.H. The Crown Prince

Engineer
Architectural Engineering Consultants (AEC)

Main Contractor
NSCC

Type of Work
Rock Revetment & Slope Protection Works

Project Details

Start Date: May 1993

Completion Date: September 1993

 

 


 
 

CONSTRUCTION & MAINTENANCE OF AL SUWWAH BRIDGE

ABU DHABI, UAE


 
 

Consultant/Client
Directorate of Military Works

Main Contractor
Overseas Ast Co. LLC

Type of Work
Bored Piles Temporary & Permanent Casing

Project Details

No. of Bored Piles: 48 nos.

Pile Diameter: 600 & 900 mm

Start Date: August 1999

Completion Date: September 1999

 
 

 
 


CONSTRUCTION OF JETTIES AT WEST BAY LAGOON
QATAR

 
 

Consultant/Client
Arab Engineering Bureau

Main Contractor
Al Fardan Group of Companies

Type of Work
Supply and Installation of 2 Pontoons & Access Bridges

Project Details


Pontoons (12m x 2.4m): 2 Nos.

Access bridge (8m x 1.8m): 2 Nos.

Power Pedestal: 2 Nos.

Water Pedestal: 2 Nos.

Mooring chain: Stainless steel

 

 