The Middle East has seen unprecedented economic revival over the past few years, and this has been particularly true within the UAE. With this in mind, NSCC has laid down the groundwork for expansion by using its local and regional experience in general foundation and marine work as a base for establishing a core engineering department responsible for estimation and delivery of large complex infrastructure and civil engineering contracts.

NSCC currently offers our clients several project delivery methods, incorporating the turnkey design and build and/or the traditional construction type of contract.

Our larger type contracts include, but are not limited to, the design and construction of quay walls (marine), civil and ground engineering works for sewage treatment plants, tunnels and deep excavations. Turnkey solutions for basement construction are offered too.

 
 
   
 
 
 

 

   
 
 
 
 
THE PALM JUMEIRAH - QUAY WALLS
DUBAI, UAE

Download the The Palm Jumeirah - Quay Walls Data Sheet

 

Client
Nakheel

Supervision Engineer
Parsons De Leuw Cather

Main Contractor
NSCC-SBF JV

Start Date
15/12/2003

Completion Date
15/12/2004
Project Details
The quay wall and the marine works package involves the design and construction of approximately 4.6 kilometers of Reinforced Concrete Diaphragm wall and other associated facilities along with excavation to -4.0 m DMD between the walls to create the inland channel. The project also consisted of marine and rock revetment works, in-situ and precast concrete works with mechanical and electrical works. NSCC- SBF JV won the contract by providing the most economical alternative design proposal.




 
 

THE PALM, JUMEIRAH - SEWAGE TREATMENT PLANT
DUBAI, UAE


Download the Palm Jumeirah - Sewage Treatment Plant Data Sheet

 
 



Client
Nakheel

Supervision Engineer
Parsons De Leuw Cather

Main Contractor
NSCC-SBF JV

Contract Value
AED 76 Million

Start Date
15/12/2004

Completion Date
15/04/2005


Project Details

This project was secured by NSCC-SBF JV as a Variation Order to Contract No JAP006/C94. It entailed construction of a circular concrete cantilevered diaphragm wall to accommodate a sewage treatment plant (by others), along with dewatering, excavation to formation level, and installation of anchor piles to support the structural uplift forces encountered during construction.

Circular Cofferdam Diameter: 76.2 m

Diaphragm Wall Thickness:
1.0 m

Diaphragm Wall Depth:
24.0 m

Maximum Excavation Depth:
16.0 m

Tension Piles:
73 Nos.

Diameter:
900 mm


 

THE PALM-JUMAIRAH, QUAY WALLS AT VILLAGE CENTER
DUBAI, UAE

Download the Palm Jumeirah - Quay Walls at Village Centre Data Sheet

Client
Nakheel

Supervision Engineer
Parsons De Lew Cather

Main Contractor
NSCC-SBF JV

Contract Value

AED 124 Million

Start Date
15/05/2005

Completion Date
30/10/2005


Project Details

This project was secured by NSCC-SBF JV as a Variation Order to Contract No. JAP006/C94.

It entailed an extension to the original contract, covering a further 4 km of diaphragm wall, along with associated dewatering and excavation works.

THE PALM, JUMEIRAH - SPINE UNDERPASS
DUBAI, UAE

Download the The Palm Jumeirah - Spine Underpass Data Sheet



Client
Nakheel

Supervision Engineer
Parsons De Lew Cather

Main Contractor
NSCC-SBF JV

Project Location
Palm Jumeirah, Dubai

Start Date
20/09/2005

Completion Date
Ongoing (scheduled for September 2006)

Project Details

The Project involves the building of an open underpass 400m long with two bridge decks on top for access across the underpass. 800mm T-sections and 1200mm diaphragm walls were built with around 260piles.

The side walls of the underpass are to have a ceramic theme.

GOLDEN MILE
PALM JUMEIRAH, DUBAI, UAE

Download the Golden Mile Data Sheet

 

Client
Souk Residences L.L.C.
(Joint Venture of IFA and Istithmar)

Consultant
L C Consult

Main Contractor
NSCC-SBF JV

Type of Work
Diaphragm Wall, Enabling and Piling Works

Start Date
19/07/2005

Completion Date
Ongoing (scheduled for September 2006)

Project Details

The works involve the construction of an anchored diaphragm retaining wall, 1km long, 22m deep, 2500 piles of various diameters (670mm, 770mm, 870mm), two rows of sheet piling with tie rods at one side, dewatering, excavation and blinding. The final product is two clean boxes 22800 m2 & 34200 m2 at pile cap level ready for the building contractor.

Diaphragm Wall: 1 km

Depth:
22 m

No. of Bored Piles:
2500 nos

Diameter:
670, 770 & 870 mm





 
   
 

Client
Dubai Dry Docks

Consultant
Royal Haskoning


Main Contractor
NSCC-SBF JV

Project Location
Dubai Dry Docks, Dubai

Start Date
01
/08/2005

Completion Date
01/07/2006

 

Project Details

Works executed in the Contract comprise of the construction of a ship launch and recovery system. The facility will include.

Back filling existing basin: 300,000 m3

Formation of a hydrolift basin constructed of Diaphragm Wall (800m) and reinforced concrete walls.
A piled reinforced concrete platform (550 piles), approximately 130m x 70m, designed to support the loads from vessels under repair and sections of new ships during launching.

Construction of two dolphins - 32m x 22m depth ea.

Installation of two mooring piles.

Foundation for removable steel landward gate (gate constructed by others).

Gate abutments and sill for floating caisson gate (gate constructed by others).

       
 

 

   
 

 


 
       
       

 